what we do

 Solar EPC (Engineering, Procurement, and Construction) is the process of designing, building, and commissioning solar power plants. Here are the steps involved in a typical solar EPC project: 

Feasibility study:

The feasibility study helps to determine the size and type of solar power plant that can be built at the site. 

 

Things Carried Out during a Solar Site Survey are:

  • Roof Orientation and Shading Analysis
  • Roofing Details
  • Load Analysis
  • Solar PV System Usability Check
  • Financial Analysis

Engineering:

Once the feasibility study is complete, the next step is to design the solar power plant. This involves creating detailed engineering drawings and specifications for all the components of the solar power plant, including the solar panels, inverters, mounting structures, and electrical systems considering extreme weather conditions.

Procurement:

With the engineering designs in place, the next step is to procure all the necessary materials and equipment. This includes the solar panels, inverters, mounting structures, and other components.

Construction:

Once the materials and equipment have been procured, the construction phase can begin. This involves installing the solar panels, mounting structures, inverters, and electrical systems. Depending on the size of the solar power plant, construction can take several months to complete.

Testing and commissioning:

Once the solar power plant has been constructed, it must be tested and commissioned to ensure that it is operating correctly. This involves performing a series of tests on the solar panels, inverters, and electrical systems to ensure that they are working properly.

Operations and maintenance:

Once the solar power plant is operational, it requires ongoing maintenance and monitoring to ensure that it continues to operate efficiently. This includes cleaning the solar panels, replacing any faulty components, and monitoring the performance of the solar power plant to ensure that it is generating the expected amount of electricity.

WHY CHOOSE US FOR YOUR SOLAR POWER PLANT

Authorized Brand Partners

Solar Installers You Can Trust

Solar Installers You Can Trust

We are authorized partner of Saatvik Group & Direct Dealers of other reputed brands. 

So, Panels we use are A-Grade & have Genuine Manufacturer's Warranties.

This ensures hassle free After Sales Services


Solar Installers You Can Trust

Solar Installers You Can Trust

Solar Installers You Can Trust

 A team of qualified engineers is essential to ensure that a SPGS is designed safely, efficiently, and effectively. They have expertise in electrical, mechanical, and civil engineering, and are responsible for the installation of solar panels, inverters, and other equipment to  ensure that a solar power system is optimized for maximum efficiency and performance 

Satisfaction Guaranteed

Solar Installers You Can Trust

Satisfaction Guaranteed

  • Best Quality Products Are Used
  • On-time Installations
  • Experience Of 100+ Installations
  • Right Price Ensured
  • PAN Punjab Presence

Few Of our executed plants

First site to get installed with 415wp module

First site to get installed with 415wp module

First site to get installed with 415wp module

 75 Kwp at Amandeep Medicity, Amritsar  

First site to get installed with 415wp module

First site to get installed with 415wp module

500 Kwp at Sharman Woollen Mills, Ludhiana

First site to get installed with 415wp module

30 Kwp at Gokal Industries, Ludhiana

First site to get installed with 415wp module

325 Kwp at Amar Wheels, Ludhiana

Video

190 Kwp at Doaba Cold Store, Nawanshahar (Punjab)

First Plant in Punjab Installed With 540wp Modules

100 Kwp at Tagore International School

123 Kwp at SIDCUL in Haridwar

Experience of 20 MW+ & 500+ Installations in EPC


Copyright © 2023 KGK Group - All Rights Reserved.

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept